AI Implementation Cost Model

The cost structure of an implementation programme and the variables that move a quote up or down.

Type
Research
Topic
Economics
Author
AEGIS OS™
Published
Updated

Key takeaways

  • Licence cost is the smallest line in an implementation. The expensive work is establishing truth, defining process and building governance around them.
  • Six drivers explain most of the variance between two quotes for superficially similar scopes.
  • Data condition and process definition are assessed before anything is built, because they move cost further than any other factor.
  • This page publishes the model, not a price. AEGIS quotes from an approved architecture and makes no claim of savings or return.

Where the money actually goes

Buyers arrive expecting a software price and a subscription. An implementation programme has a different shape: most of the effort is spent making the organization legible enough for intelligence to operate on it safely.

Cost components of a governed implementation programme
 What it coversWhat drives its size
Architecture AssessmentThe paid diagnostic: operating model map, truth definition, blueprint, readiness analysis, roadmap and quoteNumber of functions in scope and organizational complexity
Truth and data workAgreeing records, definitions and owners; reconciling duplicates; establishing data contractsHow fragmented and undefined the current records are
Process definitionMapping how work actually runs, including undocumented exceptionsHow much the process varies by individual
Build and configurationWorkflows, intelligence roles, interfaces and permissionsNumber of workflows and distinct roles, not headcount
IntegrationConnections to systems of record and work executionInterface quality of the systems, not their quantity
Governance and validationApproval boundaries, audit trail, testing against real work, operator trainingRegulatory, contractual and audit obligations
Managed IntelligenceOngoing operation, monitoring, governance review and continued buildDeployed footprint and review cadence

The six drivers and how far each one moves a quote

Direction and relative magnitude are given below. Absolute figures are deliberately absent: a number published without the architecture behind it is a guess wearing a decimal point.

Cost drivers, direction of effect and relative magnitude
 Lower end looks likeUpper end looks likeRelative effect
Data conditionRecords structured, owned and broadly trustedDuplicated records, contested definitions, spreadsheets as systems of recordLargest single driver
Process definitionDocumented, consistent, exceptions understoodEvery operator runs it differently and exception is the normLarge
Functions in scopeOne team, one end-to-end pathSeveral functions with shared handoffs and competing definitionsLarge, and compounding rather than additive
Integration surfaceModern systems with usable interfacesLegacy systems, manual exports, no supported interfaceModerate to large
Governance obligationsStandard internal approvalsRegulated, contractual or externally audited controlsModerate, concentrated in validation
Change capacityEngaged executive owner, operators available for sessionsNo named owner, operators unavailable to validateModerate on cost, decisive on timeline

The compounding effect

Two functions cost more than twice one function, because the expensive part is reconciling their competing definitions of the same entity — a cost that does not exist in a single-function scope.

How to read a quote you are given

  1. Ask which architecture the quote was produced from. A quote that precedes an architecture is a guess about your business.
  2. Ask what the data work assumes. An implementation priced without inspecting record condition will be re-priced later.
  3. Ask which steps carry a human approver and who is named. Governance omitted from scope is governance omitted from the build.
  4. Ask what happens after go-live, and at what cadence. A system nobody operates degrades within a quarter.
  5. Ask what is excluded. The exclusions describe the real scope more accurately than the inclusions.

No return promised

AEGIS prices work, not outcomes. Nothing in this model constitutes a projection of savings, efficiency or return; those depend on decisions, adoption and conditions outside our control.

Sources and references

  • AEGIS engagement scope records — Confirm which drivers actually moved scope across completed engagements. Any published magnitude must be supportable from these records or removed.
  • Pricing page — Published cost-driver table — keep the two consistent.

Reviewed and published. Magnitudes are relative and directional only. No absolute price, saving or return is stated, and AEGIS quotes only from an approved architecture.

Start with an Architecture Assessment

An Architecture Assessment turns these questions into a documented blueprint, readiness analysis, implementation roadmap and quote for your organization.

Related resources

  • Guide

    Architecture Assessment Checklist

    What to gather before a diagnostic: systems, data, workflows, decision rights, constraints and desired outcomes.